Skip to content

Project charter

  • Status: approved
  • Version: 1.3 (2026-11-23)
  • Owner: Antoine Duquenne

Pulse is the first application of my portfolio (antoine-duquenne.fr). Its goal is to show my skills in front-end architecture, integration of external APIs and delivery with CI/CD, on a small but complete project.

Pulse is a customizable dashboard. Users add widgets, move and resize them, and share their dashboard with a link.

# Objective Measure
O1 Deliver a public dashboard with 4 widgets Available at pulse.antoine-duquenne.fr
O2 Let users customize the layout Add, remove, move and resize widgets; layout kept after reload
O3 Let users share a dashboard A link opens the same layout on another device
O4 Build a modular widget architecture A new widget needs no change in the dashboard core
O5 Deliver with professional quality CI green, test coverage ≥ 70 % on business code, accessibility score ≥ 90 (Lighthouse)
O6 Document the project Charter, architecture, ADRs, test strategy, operations guide and review published
  • Dashboard grid: add, remove, move and resize widgets
  • 4 widgets:
    • GitLab pipeline status of my projects
    • GitLab milestone progress (open and closed issues, progress chart)
    • “Le Vélo” bike-sharing stations in Bordeaux, in real time
    • International Space Station position on a map
  • Widget settings (for example: which project, which bike stations)
  • Layout saved in the browser, shareable by link
  • Light and dark themes
  • Responsive design (desktop and mobile)
  • User accounts and authentication
  • Widgets created by users (plugins from outside the project)
  • Real-time collaboration on the same dashboard
  • Notifications and alerts
  • English version of the interface
  • Mobile application
Who Role Needs
Visitors (recruiters, hiring managers) Main users Understand Pulse in less than one minute, without an account, on desktop or mobile
Technical reviewers (tech leads) Readers of the code and docs Clear code, explained decisions (ADRs), green CI
Antoine Duquenne Product owner, developer, operator Deliver on time, learn, show skills
Data providers: GitLab API, Bordeaux Métropole open data, ISS position API External dependencies Respect their usage limits and terms
  • Budget: €0. Only free APIs and free hosting.
  • Time: Pulse must be released by 2026-12-08. The whole portfolio must be ready on 2027-01-11.
  • Team: one developer.
  • Stack: Angular 22 (front end), Java 25 and Spring Boot 4 (back end), Docker, GitLab CI.
  • Public code: repositories are public, so no secret may be committed.
  • Personal data: none collected (no accounts, no tracking cookies), so no consent banner is needed.
  • External APIs: rate limits and availability are not under our control.
# Milestone Date
M0 Project charter approved 2026-11-20 (done)
M1 Backlog in GitLab and architecture decided (first ADRs) 2026-11-23 (done on 2026-11-21)
M2 Walking skeleton: repository, docs site, front end and back end deployed by the CI 2026-11-26
M3 Dashboard grid and first 2 widgets 2026-12-01
M4 All 4 widgets, sharing by link, themes 2026-12-05
M5 Production release and complete documentation (including review) 2026-12-08
# Risk Probability Impact Mitigation
R1 No server ready for production (Oracle Cloud sign-up blocked) High High Try Oracle again; if it still fails on 2026-11-28, rent the OVHcloud VPS-1 (plan B)
R2 An external API changes, fails or limits requests (GitLab, Bordeaux open data, ISS) Medium Medium Back-end cache, timeouts, and a clear error state in each widget
R3 The browser blocks direct calls to an API (CORS) Medium Medium Call external APIs through our back end (proxy)
R4 GitLab limits requests without authentication Medium Low Cache GitLab responses on the back end; if needed, a read-only token stored as a secret, never committed
R5 Scope creep: new widget ideas during development Medium High Follow the “out of scope” list; new ideas go to the backlog with the label “later”
R6 Learning curve (Starlight, grid library, Spring Boot 4) Medium Medium Walking skeleton first; time-box each investigation to 2 hours
R7 Fatigue and overload (10 hours a day) Medium High Keep a lighter half-day each week as a buffer
R8 GitLab CI minutes run out (400 per month) Medium Medium Monitor usage, cache dependencies; fallback: GitLab runner on the local PC
R9 Drag and drop is not usable with a keyboard Medium Medium Choose a grid library with keyboard support, or add “move” and “resize” buttons

The project is done when:

  • Objectives O1 to O6 are met.
  • All “Must have” user stories are done.
  • The pipeline is green on main and deployment is automatic.
  • Test coverage is at least 70 % on business code (front end and back end).
  • The Lighthouse accessibility score is at least 90, and the dashboard can be used with a keyboard only (manual test).
  • Each widget shows a loading state, an error state and an empty state.
  • The documentation is published: charter and review (English and French), architecture and ADRs, test strategy, operations guide, README (English and French).
  • The Pulse tile on antoine-duquenne.fr is updated: status, skills, links.

Each question is answered with an ADR. Q6 is still open.

# Question Decision
Q1 How do we save and share a layout: encoded in the link (no database) or stored on the server (short link, database)? Encoded in the link, no database (ADR 0003)
Q2 Which grid library: Angular CDK drag and drop, gridstack.js or angular-gridster2? angular-gridster2, with our own keyboard layer (ADR 0004)
Q3 What exactly does the back end do: proxy and cache only, or also store layouts? Proxy and cache only: the BFF is stateless (ADR 0003)
Q4 Which map library for the ISS widget (Leaflet or MapLibre), and which map tiles (usage terms)? MapLibre GL JS with OpenFreeMap tiles (ADR 0005)
Q5 Which data source for the ISS position? The “Where the ISS at?” API, called through the BFF (ADR 0005)
Q6 Where do we host production: Oracle Cloud or OVHcloud VPS? Decision by 2026-11-28 at the latest. Open
Q7 Do we run Lighthouse in the CI to block accessibility regressions? Yes, on every merge request of web (ADR 0006)
Version Date Change
1.0 2026-11-20 First approved version
1.1 2026-11-20 Milestones M3 to M5 moved: the portfolio deadline moved to 2027-01-11, to allow a step-by-step, learning-focused development
1.2 2026-11-23 Milestone M1 marked as done (reached on 2026-11-21)
1.3 2026-11-23 Questions Q1 to Q5 and Q7 linked to their decisions (ADR 0003 to 0006); planned and actual dates of M1