- Status: approved
- Version: 1.3 (2026-11-23)
- Owner: Antoine Duquenne
Pulse is the first application of my portfolio (antoine-duquenne.fr).
Its goal is to show my skills in front-end architecture, integration of
external APIs and delivery with CI/CD, on a small but complete project.
Pulse is a customizable dashboard. Users add widgets, move and resize
them, and share their dashboard with a link.
| # |
Objective |
Measure |
| O1 |
Deliver a public dashboard with 4 widgets |
Available at pulse.antoine-duquenne.fr |
| O2 |
Let users customize the layout |
Add, remove, move and resize widgets; layout kept after reload |
| O3 |
Let users share a dashboard |
A link opens the same layout on another device |
| O4 |
Build a modular widget architecture |
A new widget needs no change in the dashboard core |
| O5 |
Deliver with professional quality |
CI green, test coverage ≥ 70 % on business code, accessibility score ≥ 90 (Lighthouse) |
| O6 |
Document the project |
Charter, architecture, ADRs, test strategy, operations guide and review published |
- Dashboard grid: add, remove, move and resize widgets
- 4 widgets:
- GitLab pipeline status of my projects
- GitLab milestone progress (open and closed issues, progress chart)
- “Le Vélo” bike-sharing stations in Bordeaux, in real time
- International Space Station position on a map
- Widget settings (for example: which project, which bike stations)
- Layout saved in the browser, shareable by link
- Light and dark themes
- Responsive design (desktop and mobile)
- User accounts and authentication
- Widgets created by users (plugins from outside the project)
- Real-time collaboration on the same dashboard
- Notifications and alerts
- English version of the interface
- Mobile application
| Who |
Role |
Needs |
| Visitors (recruiters, hiring managers) |
Main users |
Understand Pulse in less than one minute, without an account, on desktop or mobile |
| Technical reviewers (tech leads) |
Readers of the code and docs |
Clear code, explained decisions (ADRs), green CI |
| Antoine Duquenne |
Product owner, developer, operator |
Deliver on time, learn, show skills |
| Data providers: GitLab API, Bordeaux Métropole open data, ISS position API |
External dependencies |
Respect their usage limits and terms |
- Budget: €0. Only free APIs and free hosting.
- Time: Pulse must be released by 2026-12-08. The whole portfolio must be ready on 2027-01-11.
- Team: one developer.
- Stack: Angular 22 (front end), Java 25 and Spring Boot 4 (back end), Docker, GitLab CI.
- Public code: repositories are public, so no secret may be committed.
- Personal data: none collected (no accounts, no tracking cookies), so no consent banner is needed.
- External APIs: rate limits and availability are not under our control.
| # |
Milestone |
Date |
| M0 |
Project charter approved |
2026-11-20 (done) |
| M1 |
Backlog in GitLab and architecture decided (first ADRs) |
2026-11-23 (done on 2026-11-21) |
| M2 |
Walking skeleton: repository, docs site, front end and back end deployed by the CI |
2026-11-26 |
| M3 |
Dashboard grid and first 2 widgets |
2026-12-01 |
| M4 |
All 4 widgets, sharing by link, themes |
2026-12-05 |
| M5 |
Production release and complete documentation (including review) |
2026-12-08 |
| # |
Risk |
Probability |
Impact |
Mitigation |
| R1 |
No server ready for production (Oracle Cloud sign-up blocked) |
High |
High |
Try Oracle again; if it still fails on 2026-11-28, rent the OVHcloud VPS-1 (plan B) |
| R2 |
An external API changes, fails or limits requests (GitLab, Bordeaux open data, ISS) |
Medium |
Medium |
Back-end cache, timeouts, and a clear error state in each widget |
| R3 |
The browser blocks direct calls to an API (CORS) |
Medium |
Medium |
Call external APIs through our back end (proxy) |
| R4 |
GitLab limits requests without authentication |
Medium |
Low |
Cache GitLab responses on the back end; if needed, a read-only token stored as a secret, never committed |
| R5 |
Scope creep: new widget ideas during development |
Medium |
High |
Follow the “out of scope” list; new ideas go to the backlog with the label “later” |
| R6 |
Learning curve (Starlight, grid library, Spring Boot 4) |
Medium |
Medium |
Walking skeleton first; time-box each investigation to 2 hours |
| R7 |
Fatigue and overload (10 hours a day) |
Medium |
High |
Keep a lighter half-day each week as a buffer |
| R8 |
GitLab CI minutes run out (400 per month) |
Medium |
Medium |
Monitor usage, cache dependencies; fallback: GitLab runner on the local PC |
| R9 |
Drag and drop is not usable with a keyboard |
Medium |
Medium |
Choose a grid library with keyboard support, or add “move” and “resize” buttons |
The project is done when:
- Objectives O1 to O6 are met.
- All “Must have” user stories are done.
- The pipeline is green on
main and deployment is automatic.
- Test coverage is at least 70 % on business code (front end and back end).
- The Lighthouse accessibility score is at least 90, and the dashboard can be used with a keyboard only (manual test).
- Each widget shows a loading state, an error state and an empty state.
- The documentation is published: charter and review (English and French), architecture and ADRs, test strategy, operations guide, README (English and French).
- The Pulse tile on antoine-duquenne.fr is updated: status, skills, links.
Each question is answered with an ADR. Q6 is still open.
| # |
Question |
Decision |
| Q1 |
How do we save and share a layout: encoded in the link (no database) or stored on the server (short link, database)? |
Encoded in the link, no database (ADR 0003) |
| Q2 |
Which grid library: Angular CDK drag and drop, gridstack.js or angular-gridster2? |
angular-gridster2, with our own keyboard layer (ADR 0004) |
| Q3 |
What exactly does the back end do: proxy and cache only, or also store layouts? |
Proxy and cache only: the BFF is stateless (ADR 0003) |
| Q4 |
Which map library for the ISS widget (Leaflet or MapLibre), and which map tiles (usage terms)? |
MapLibre GL JS with OpenFreeMap tiles (ADR 0005) |
| Q5 |
Which data source for the ISS position? |
The “Where the ISS at?” API, called through the BFF (ADR 0005) |
| Q6 |
Where do we host production: Oracle Cloud or OVHcloud VPS? Decision by 2026-11-28 at the latest. |
Open |
| Q7 |
Do we run Lighthouse in the CI to block accessibility regressions? |
Yes, on every merge request of web (ADR 0006) |
| Version |
Date |
Change |
| 1.0 |
2026-11-20 |
First approved version |
| 1.1 |
2026-11-20 |
Milestones M3 to M5 moved: the portfolio deadline moved to 2027-01-11, to allow a step-by-step, learning-focused development |
| 1.2 |
2026-11-23 |
Milestone M1 marked as done (reached on 2026-11-21) |
| 1.3 |
2026-11-23 |
Questions Q1 to Q5 and Q7 linked to their decisions (ADR 0003 to 0006); planned and actual dates of M1 |